| MediaCorp of Singapore Pte Ltd | Maintenance, repair, addition & alteration to properties of MediaCorp of Singapore | Oct 2000 - Sep 2002 | |
| Kian Hiap Construction Pte Ltd | Install Mechanical Expansion Joint Cover for Temasek Polytechnic Project | Apr 2001 - Jun 2001 | |
| Shimizu Corporation | Repair cracks on R.C. structure using Unifor Crack Injection System for Grange Residences Project | Jul 2001 - Mar 2002 | |
| Hyundai Engineering & Construction Co., Ltd | Repair of water leakage on cracks & honeycomb for World Trade Centre Station MRT NEL C711 Project | Aug 2001 - Jun 2004 | |
| Lum Chang Building Contractors Pte Ltd | Repair of water leakage on basement floor & wall for 6 Battery Road Project | Sep 2001 - Jul 2002 |
|
| Tekken/Union/SP J.V. | Repair cracks on R.C. Track Bed Slab inside Tunnel using Unifor Crack Injection System (Epoxy Grouting) for MRT NEL C716 Project | Dec 2001 - Mar 2002 | Ken-Pal (S) Pte Ltd | Repair honeycomb on R.C. column for Pasir Ris UMCI Project | Dec 2001 - Dec 2001 |
| Gammon Pte Ltd | Repair cracks on R.C. soffit and column using Unifor Crack Injection System for (Yue Hwa Building) OG Project | Dec 2001 - Dec 2001 | |
| NLC Construction Pte Ltd | Repair Hollow Plaster of R.C. Wall/Column and grout gap between marble and R.C. toilet wall using UF Grout and repair cracks at basement 1 floor slab using Unifor Crack Injection System (Epoxy grouting) for Compass Heights Condominium (Sengkang) Project | Dec 2001 - Jul 2003 | |
| Hyundai Engineering & Construction Co., Ltd | Repair cracks to Jamuna Bridge in Dhaka, Bangladesh
using Unifor Crack Injection System (Epoxy Grouting)
Click here to view slides on work done at Jamuna Bridge |
2002-2005 | |
| SsangYong Engineering & Construction Co. Ltd | Repair honeycomb on Silo construction joint and repair cracks on Silo surface using Unifor Crack Injection System (Epoxy Grouting) for Jurong Port Project | Jan 2002 - Apr 2002 | |
| Teamcon Pte Ltd | Repair water leakage on construction joint and honeycomb using for MRT NEL C707 Project | Feb 2002 - Apr 2002 | Civil Aviation Authority of Singapore | Hack off existing nosing beside expansion joint and make good, and repair water leakage and waterproof on basement R.C. wall at Changi Airport Terminal 2. | Jun 2002 - Jul 2002 | Ken-Pal (S) Pte Ltd | Pressure grout honeycomb area and repair cracks on R.C. soffit and beam using Unifor Crack Injection System (Epoxy Grouting) at Bencoolen Street for Proposed NAFA Building Project | Aug 2002 - Aug 2003 | Chye Joo Construction Pte Ltd | Waterproof internal/external walls at R.C. Services Tunnel and Box Culverts using Unifor Crystalline Waterproofing System (Unifor Crystal) and repair cracks on Box Culvert using Unifor Crack Injection System (Epoxy Grouting) for Jurong Island (Meranti) Project | Aug 2002 - Dec 2003 |
| Hiap Kian Hoe Construction Pte Ltd | Drill and anchor starter bars and repair cracks on pile cap surface using Unifor Crack Injection System (Epoxy Grouting) for No. 7, Benoi Road Project | Nov 2002 - Jan 2003 | |
| Lum Chang Building Contractors Pte Ltd | Repair dry cracks on basement soffit using Unifor Crack Injection System, grout gap between pipe and reinforced concrete CD shelter wall and repair water leakage for Levelz Condominium Farrer Road Project | Dec 2002 - 2005 | |
| EAC Enterprise Pte Ltd | Repair cracks on floor slab using Unifor Crack Injection System (Epoxy Grouting) for Tampines HDB (Void Deck) Project | Jan 2003 - Mar 2003 | |
| Obayashi-Futsu J.V. | Repair structural cracks using Unifor Crack Injection System (Epoxy Grouting) for Taiwan High Speed Railway System Contract 210 & 215 Project | Jan 03 – 2006 | |
| Daiho Corporation | Repair structural cracks using Unifor Crack Injection System (Epoxy Grouting) for Taiwan High Speed Railway System Contract 220 Project | Jan 03 - 2006 | |
| Hyundai-Chung Liu-Zen Pacific | Repair structural cracks using Unifor Crack Injection System (Epoxy Grouting) for Taiwan High Speed Railway System Contract 230 Project | Jan 03 - 2006 | |
| Evergreen-Shimizu J.V | Repair structural cracks using Unifor Crack Injection System (Epoxy Grouting) for Taiwan High Speed Railway System Contract 291 Project | Jan 03 - 2006 | |
| A P Lim Builders Pte Ltd | Spalling concrete repair and repair cracks on slab soffit and beam using Unifor Crack Injection System (Epoxy Grouting) at JTC Block 998 Toa Payoh North | Mar 2003 | |
| Sato Kogyo – Quek & Quek JV | Repair cracks on Pier 5 and viaduct at Pier 8 using Unifor Crack Injection System (Epoxy Grouting) at Tampines Ave 10 | Apr 2003 | |
| Hyundai Engineering & Construction Co., Ltd | Repair cracks on construction joint and R.C. soffit using Unifor Crack Injection System (Epoxy Grouting) for Eunos Link Techno Park Project | Apr 2003 - Mar 2005 |