| S/No. |
Client |
Description |
Date |
| 201 |
Ken-Pal (S) Pte Ltd |
Repair honeycomb on R.C. column using Cementitious Pressure Grouting
Method for Choa Chu Kang 230KV Substation Project |
Sep 2009 |
| 202 |
Penta-Ocean Construction Co., Ltd |
Repair dry cracks on R.C. soffit slab using Unifor Crack Injection System
and repair water leakage on cracks, construction joint and honeycomb on R.C. soffit slab
using Unifor Underwater Epoxy Grouting Method for Marina Bay Sands IR Development -
Art Science Museum Project |
Oct 2009 - Jul 2010 |
| 203 |
Sato Kogyo (S) Pte Ltd |
Repair dry cracks on pile cap wall using Unifor Crack Injection System
for National University of Singapore Bridge Project |
Oct 2009 |
| 204 |
Obayashi - Woh Hup J.V. |
Repair dry cracks on R.C. soffit and slab using Unifor Crack Injection
System for Ocean Financial Centre Project |
Nov 2009 - Jun 2011 |
| 205 |
Frisco Technology & Services Pte Ltd |
Repair water leakage using Internal Drainage System with Sealant installation,
and repair water leakage on R.C. slab & wall using Polyurethane Grouting Method for
Standard Chartered Bank Project |
Dec 2009 - Jan 2010 |
| 206 |
Kingsland Development Pte Ltd |
Repair seepage from joint of R.C. wall & floor lsab using Polyurethane
Grouting Method for Cargotec Factory Project |
Dec 2009 - Jan 2010 |
| 207 |
Sembawang Engineers & Constructors Pte Ltd |
Grout water leakage from WSM pile using Polyurethane Grouting Method
for C906 Downtown Line Stage 1 Project |
Dec 2009 - Feb 2010 |
| 208 |
Kingsland Development Pte Ltd |
Repair water leakage from construction joint of R.C. slab and beam
using Polyurethane Grouting Method at 12A Jalan Samulun |
Jan 2010 |
| 209 |
Samsung C & T Corporation |
Repair overhacking on R.C. wall inside station at C909 interface using
Cementitious Pressure Grouting Method for C908 Downtown Line 1 Project |
Jan 2010 - Feb 2010 |
| 210 |
Quek & Quek Civil Engineering Pte Ltd |
Repair buldging R.C. wall using Pinning Method, and repair dry cracks
on R.C. wall using Unifor Crack Injection System for 59 Shipyard Road SMLS Project |
Jan 2010 - Feb 2010 |
| 211 |
Penta Ocean Construction Co., Ltd |
Pressure Grout gap between steel plate and R.C. column using Cementitious
Pressure Grouting Method for Marina Promenade 8400 Project |
Jan 2010 - Mar 2011 |
| 212 |
Taisei Corporation |
Repair dry cracks on R.C. soffit slab & wall inside Cut & Cover Tunnel
using Unifor Crack Injection System, and repair water leakage from cracks, construction
joint and honeycomb on R.C. soffit slab & wall inside Cut & Cover Tunnel using Unifor
Underwater Epoxy Grouting Method for MRT CCL4 C854 Bukit Brown Station Project |
Jan 2010 - Feb 2010 |
| 213 |
Jia Construction Co., Pte Ltd |
Repair spalling concrete on existing R.C. column using Pressure Grouting
Method & Patching Method, pressure grout gap between existing R.C. beam & wall using Pressure
Grouting Method, and repair dry cracks on R.C. beam using Unifor Crack Injection System
for No. 33 & 34 Boat Quay Project |
Jan 2010 - Feb 2010 |
| 214 |
Taisei Corporation |
Repair water leakage on basement R.C. wall & soffit slab at Inner Bound
wall & Soffit for MRT CCL4 C854 Thomson Station Project |
Feb 2010 - May 2011 |
| 215 |
Hyundai Engineering & Construction Co., Ltd |
Repair dry cracks on R.C. slab, R.C. beam & R.C. wall using Unifor Crack
Injection System; repair wet cracks on R.C. slab, R.C. beam & R.C. wall using Unifor
Underwater Epoxy Grouting Method; and repair water leakage on honeycomb, cracks & Construction
joint on basement water tank using Polyurethane Grouting Method for Overseas Union House
Project |
Feb 2010 - Nov 2011 |
| 216 |
The MCST Plan No. 3448 |
Repair water leakage on cracks, honeycomb and construction joint at
Tower 1 Lobby A Lift Shaft at Orchard Scotts |
Mar 2010 |
| 217 |
The Screening Room |
Repair cracks on beam using Unifor Crack Injection System at
No. 12 Ann Siang Road |
Mar 2010 |
| 218 |
PH Hydraulics & Engineering Pte Ltd |
To core holes and grout gap between baseplate and R.C. slab using Unifor epoxy grouting method
at Resort World Sentosa Crane Dance |
May - Aug 2010 |
| 219 |
Toh Teck Seng Engineering & Construction Pte Ltd |
Repair waterleakage on pipe penetration to valve pits using polyurethane grouting method
and repair dry cracks on R.C. wall using Unifor Crack Injection System
at Exxon Mobil in Jurong Island |
Apr 2010- May 2011 |
220 |
L&M Foundation Specialist Pte Ltd |
Repair to waterleakage on R.C. Skin Wall & Diaphragm Wall inside cut
and cover tunnel using Polyurethane Grouting Method at MRT Circle Line
Stage 4 C856 |
May - Nov 2010 |
221 |
Greatearth Construction Pte Ltd |
Repair dry cracks on R.C. slab using Unifor Crack Injection
System at Ascentia Sky Condominium |
Apr 2010 - Jan 2011 |
222 |
Marina Properties Pte Ltd |
Repair water leakage and cracks using Unifor Epoxy Grouting Method at
Millenia Walk and Tower |
Jun 2010 - ongoing |
223 |
Daelim Industrial Co Ltd |
To grout water leakage surrounding R.C. Bored Pile and inside Bored Pile at
MCE C487 using Unifor Underwater Epoxy Grouting Method |
Jul 2010 - Sep 2010 |