S/No.
Client
Description
Date
201
Ken-Pal (S) Pte Ltd Repair honeycomb on R.C. column using Cementitious Pressure Grouting Method for Choa Chu Kang 230KV Substation Project Sep 2009
202
Penta-Ocean Construction Co., Ltd Repair dry cracks on R.C. soffit slab using Unifor Crack Injection System and repair water leakage on cracks, construction joint and honeycomb on R.C. soffit slab using Unifor Underwater Epoxy Grouting Method for Marina Bay Sands IR Development - Art Science Museum Project Oct 2009 - Jul 2010
203
Sato Kogyo (S) Pte Ltd Repair dry cracks on pile cap wall using Unifor Crack Injection System for National University of Singapore Bridge Project Oct 2009
204
Obayashi - Woh Hup J.V. Repair dry cracks on R.C. soffit and slab using Unifor Crack Injection System for Ocean Financial Centre Project Nov 2009 - Jun 2011
205
Frisco Technology & Services Pte Ltd Repair water leakage using Internal Drainage System with Sealant installation, and repair water leakage on R.C. slab & wall using Polyurethane Grouting Method for Standard Chartered Bank Project Dec 2009 - Jan 2010
206
Kingsland Development Pte Ltd Repair seepage from joint of R.C. wall & floor lsab using Polyurethane Grouting Method for Cargotec Factory Project Dec 2009 - Jan 2010
207
Sembawang Engineers & Constructors Pte Ltd Grout water leakage from WSM pile using Polyurethane Grouting Method for C906 Downtown Line Stage 1 Project Dec 2009 - Feb 2010
208
Kingsland Development Pte Ltd Repair water leakage from construction joint of R.C. slab and beam using Polyurethane Grouting Method at 12A Jalan Samulun Jan 2010
209
Samsung C & T Corporation Repair overhacking on R.C. wall inside station at C909 interface using Cementitious Pressure Grouting Method for C908 Downtown Line 1 Project Jan 2010 - Feb 2010
210
Quek & Quek Civil Engineering Pte Ltd Repair buldging R.C. wall using Pinning Method, and repair dry cracks on R.C. wall using Unifor Crack Injection System for 59 Shipyard Road SMLS Project Jan 2010 - Feb 2010
211
Penta Ocean Construction Co., Ltd Pressure Grout gap between steel plate and R.C. column using Cementitious Pressure Grouting Method for Marina Promenade 8400 Project Jan 2010 - Mar 2011
212
Taisei Corporation Repair dry cracks on R.C. soffit slab & wall inside Cut & Cover Tunnel using Unifor Crack Injection System, and repair water leakage from cracks, construction joint and honeycomb on R.C. soffit slab & wall inside Cut & Cover Tunnel using Unifor Underwater Epoxy Grouting Method for MRT CCL4 C854 Bukit Brown Station Project Jan 2010 - Feb 2010
213
Jia Construction Co., Pte Ltd Repair spalling concrete on existing R.C. column using Pressure Grouting Method & Patching Method, pressure grout gap between existing R.C. beam & wall using Pressure Grouting Method, and repair dry cracks on R.C. beam using Unifor Crack Injection System for No. 33 & 34 Boat Quay Project Jan 2010 - Feb 2010
214
Taisei Corporation Repair water leakage on basement R.C. wall & soffit slab at Inner Bound wall & Soffit for MRT CCL4 C854 Thomson Station Project Feb 2010 - May 2011
215
Hyundai Engineering & Construction Co., Ltd Repair dry cracks on R.C. slab, R.C. beam & R.C. wall using Unifor Crack Injection System; repair wet cracks on R.C. slab, R.C. beam & R.C. wall using Unifor Underwater Epoxy Grouting Method; and repair water leakage on honeycomb, cracks & Construction joint on basement water tank using Polyurethane Grouting Method for Overseas Union House Project Feb 2010 - Nov 2011
216
The MCST Plan No. 3448 Repair water leakage on cracks, honeycomb and construction joint at Tower 1 Lobby A Lift Shaft at Orchard Scotts Mar 2010
217
The Screening Room Repair cracks on beam using Unifor Crack Injection System at No. 12 Ann Siang Road Mar 2010
218
PH Hydraulics & Engineering Pte Ltd To core holes and grout gap between baseplate and R.C. slab using Unifor epoxy grouting method at Resort World Sentosa Crane Dance May - Aug 2010
219
Toh Teck Seng Engineering & Construction Pte Ltd Repair waterleakage on pipe penetration to valve pits using polyurethane grouting method and repair dry cracks on R.C. wall using Unifor Crack Injection System at Exxon Mobil in Jurong Island Apr 2010- May 2011
220
L&M Foundation Specialist Pte Ltd Repair to waterleakage on R.C. Skin Wall & Diaphragm Wall inside cut and cover tunnel using Polyurethane Grouting Method at MRT Circle Line Stage 4 C856 May - Nov 2010
221
Greatearth Construction Pte Ltd Repair dry cracks on R.C. slab using Unifor Crack Injection System at Ascentia Sky Condominium Apr 2010 - Jan 2011
222
Marina Properties Pte Ltd Repair water leakage and cracks using Unifor Epoxy Grouting Method at Millenia Walk and Tower Jun 2010 - ongoing
223
Daelim Industrial Co Ltd To grout water leakage surrounding R.C. Bored Pile and inside Bored Pile at MCE C487 using Unifor Underwater Epoxy Grouting Method Jul 2010 - Sep 2010

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9